Triple

T22019859
Position Surface form Disambiguated ID Type / Status
Subject Ahmednagar railway station E543811 entity
Predicate line P1293 FINISHED
Object Pune–Manmad line NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pune–Manmad line | Statement: [Ahmednagar railway station, line, Pune–Manmad line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pune–Manmad line
Context triple: [Ahmednagar railway station, line, Pune–Manmad line]
  • A. Pune–Solapur line
    The Pune–Solapur line is a key railway route in the Indian state of Maharashtra that connects the major cities of Pune and Solapur and serves as an important corridor for both passenger and freight traffic.
  • B. Pune–Miraj–Londa line
    The Pune–Miraj–Londa line is a key railway route in western and southern India that connects Maharashtra with Karnataka, serving as an important corridor for both passenger and freight traffic.
  • C. Pune–Daund railway line
    The Pune–Daund railway line is a key rail corridor in Maharashtra, India, connecting the city of Pune with the junction town of Daund and serving as an important route for both passenger and freight trains.
  • D. Pune–Satara railway line
    The Pune–Satara railway line is a key broad-gauge rail route in Maharashtra, India, connecting the city of Pune with Satara and serving as an important corridor for regional passenger and freight transport.
  • E. Nagpur–Bhusawal line
    The Nagpur–Bhusawal line is a major railway route in central India that connects Nagpur with Bhusawal, forming an important segment of the Howrah–Mumbai main line.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Pune–Manmad line
Target entity description: The Pune–Manmad line is a key railway route in the Indian state of Maharashtra that connects the city of Pune with Manmad, passing through important intermediate towns and junctions.
  • A. Pune–Solapur line
    The Pune–Solapur line is a key railway route in the Indian state of Maharashtra that connects the major cities of Pune and Solapur and serves as an important corridor for both passenger and freight traffic.
  • B. Pune–Miraj–Londa line
    The Pune–Miraj–Londa line is a key railway route in western and southern India that connects Maharashtra with Karnataka, serving as an important corridor for both passenger and freight traffic.
  • C. Pune–Daund railway line
    The Pune–Daund railway line is a key rail corridor in Maharashtra, India, connecting the city of Pune with the junction town of Daund and serving as an important route for both passenger and freight trains.
  • D. Pune–Satara railway line
    The Pune–Satara railway line is a key broad-gauge rail route in Maharashtra, India, connecting the city of Pune with Satara and serving as an important corridor for regional passenger and freight transport.
  • E. Nagpur–Bhusawal line
    The Nagpur–Bhusawal line is a major railway route in central India that connects Nagpur with Bhusawal, forming an important segment of the Howrah–Mumbai main line.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2e8ea4819084210fe06d3a1b8d completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f127c6b5fc8190bc49ddb058f28a44 completed April 28, 2026, 9:33 p.m.
Created at: April 16, 2026, 8:23 p.m.