Triple

T22015621
Position Surface form Disambiguated ID Type / Status
Subject E. V. Spence Reservoir E543700 entity
Predicate impoundedBy P10781 FINISHED
Object Robert Lee Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Robert Lee Dam | Statement: [E. V. Spence Reservoir, impoundedBy, Robert Lee Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Robert Lee Dam
Context triple: [E. V. Spence Reservoir, impoundedBy, Robert Lee Dam]
  • A. Robert Lee Dam chosen
    Robert Lee Dam is a Texas water-control structure on the Colorado River built to impound the E. V. Spence Reservoir for municipal water supply, flood control, and recreation.
  • B. Richard B. Russell Dam
    Richard B. Russell Dam is a hydroelectric and flood-control structure on the Savannah River that creates Richard B. Russell Lake along the Georgia–South Carolina border.
  • C. Beauregard Dam
    Beauregard Dam is a hydroelectric dam located in the Valgrisenche valley in Italy’s Aosta Valley region.
  • D. Cordell Hull Dam
    Cordell Hull Dam is a hydroelectric and flood-control dam on the Cumberland River in Tennessee, operated by the U.S. Army Corps of Engineers.
  • E. Asa Dam
    Asa Dam is a major earth-fill dam in Ilorin, Kwara State, Nigeria, built primarily for water supply, irrigation, and flood control along the Asa River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2db934819095556760c7d85e4d completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f127a774548190bcd98dc28f2d2c5f completed April 28, 2026, 9:33 p.m.
Created at: April 16, 2026, 8:22 p.m.