Triple
T22015398
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Frogner Park |
E543693
|
entity |
| Predicate | constructionOfVigelandInstallationCompleted |
P146281
|
FINISHED |
| Object | 1940s |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1940s | Statement: [Frogner Park, constructionOfVigelandInstallationCompleted, 1940s]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: constructionOfVigelandInstallationCompleted Context triple: [Frogner Park, constructionOfVigelandInstallationCompleted, 1940s]
-
A.
completionOfSculptures
Indicates that one entity is responsible for finishing or bringing to completion the creation or production of sculptures associated with another entity.
-
B.
sculptureInstallationStart
Indicates the point in time when the process of installing a sculpture begins.
-
C.
sculptureParkName
Indicates that a sculpture park has the specified name.
-
D.
constructionOfArchCompleted
Indicates that the process of building or assembling an arch has been fully finished.
-
E.
churchConstructionCompleted
Indicates that the process of building or constructing a church has been finished.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e2db934819095556760c7d85e4d |
completed | April 16, 2026, 5:36 p.m. |
| NER | Named-entity recognition | batch_69f127a774548190bcd98dc28f2d2c5f |
completed | April 28, 2026, 9:33 p.m. |
| PD | Predicate disambiguation | batch_69e6f62dc9d88190ae387f145f9528de |
completed | April 21, 2026, 3:59 a.m. |
| PDg | Predicate description generation | batch_69e6fad4a540819096cdd5ea08527220 |
completed | April 21, 2026, 4:19 a.m. |
Created at: April 16, 2026, 8:22 p.m.