Triple

T22011291
Position Surface form Disambiguated ID Type / Status
Subject Cremonese school of violin making E543579 entity
Predicate instanceOf P0 FINISHED
Object school of violin making C45661 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: school of violin making
Context triple: [Cremonese school of violin making, instanceOf, school of violin making]
  • A. violin-making period
    A violin-making period is a span of time characterized by distinct stylistic, technical, and material practices in the construction of violins, often associated with particular regions, schools, or makers.
  • B. violin
    A violin is a small, four-stringed bowed musical instrument held under the chin, known for its high pitch, expressive tone, and central role in orchestral and solo performance.
  • C. Stradivarius instrument
    A Stradivarius instrument is a highly prized stringed instrument, typically a violin, crafted by Antonio Stradivari or his family, renowned for its exceptional craftsmanship, historical significance, and distinctive tonal quality.
  • D. school of furniture making
    A school of furniture making is an educational institution or program dedicated to teaching the design, craftsmanship, and construction techniques involved in creating functional and artistic furniture.
  • E. musical instrument maker
    A musical instrument maker is a craftsperson who designs, constructs, and often repairs musical instruments, combining technical skill with acoustic and artistic understanding.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2db934819095556760c7d85e4d completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:22 p.m.