Triple

T22009924
Position Surface form Disambiguated ID Type / Status
Subject Waddell & Harrington E543547 entity
Predicate notableWork P4 FINISHED
Object The Broadway Bridge (Portland, Oregon) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: The Broadway Bridge (Portland, Oregon) | Statement: [Waddell & Harrington, notableWork, The Broadway Bridge (Portland, Oregon)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: The Broadway Bridge (Portland, Oregon)
Context triple: [Waddell & Harrington, notableWork, The Broadway Bridge (Portland, Oregon)]
  • A. Oregon City–West Linn Arch Bridge
    The Oregon City–West Linn Arch Bridge is a historic concrete arch bridge spanning the Willamette River in Oregon, connecting the cities of Oregon City and West Linn.
  • B. Oregon City Bridge
    The Oregon City Bridge is a historic concrete arch bridge spanning the Willamette River in Oregon City, Oregon, known for its distinctive design and role as a key local transportation link.
  • C. Marquam Bridge
    The Marquam Bridge is a major double-decked freeway bridge in Portland, Oregon, carrying Interstate 5 across the Willamette River.
  • D. NW 12th Avenue Bridge
    The NW 12th Avenue Bridge is a movable bascule bridge in Miami, Florida, carrying NW 12th Avenue across the Miami River and serving as a key local traffic link.
  • E. Oregon Street Bridge
    The Oregon Street Bridge is a historic bascule bridge spanning the Sturgeon Bay Ship Canal in Sturgeon Bay, Wisconsin, carrying vehicular traffic between the city’s downtown areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: The Broadway Bridge (Portland, Oregon)
Target entity description: The Broadway Bridge in Portland, Oregon, is a historic steel truss bascule bridge spanning the Willamette River and serving as a key transportation link near the city’s downtown.
  • A. Oregon City–West Linn Arch Bridge
    The Oregon City–West Linn Arch Bridge is a historic concrete arch bridge spanning the Willamette River in Oregon, connecting the cities of Oregon City and West Linn.
  • B. Oregon City Bridge
    The Oregon City Bridge is a historic concrete arch bridge spanning the Willamette River in Oregon City, Oregon, known for its distinctive design and role as a key local transportation link.
  • C. Marquam Bridge
    The Marquam Bridge is a major double-decked freeway bridge in Portland, Oregon, carrying Interstate 5 across the Willamette River.
  • D. NW 12th Avenue Bridge
    The NW 12th Avenue Bridge is a movable bascule bridge in Miami, Florida, carrying NW 12th Avenue across the Miami River and serving as a key local traffic link.
  • E. Oregon Street Bridge
    The Oregon Street Bridge is a historic bascule bridge spanning the Sturgeon Bay Ship Canal in Sturgeon Bay, Wisconsin, carrying vehicular traffic between the city’s downtown areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2db934819095556760c7d85e4d completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f127a376048190a78ba7efd303b58a completed April 28, 2026, 9:33 p.m.
Created at: April 16, 2026, 8:22 p.m.