Triple
T22009905
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Waddell & Harrington |
E543547
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge design firm |
C25896
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge design firm Context triple: [Waddell & Harrington, instanceOf, bridge design firm]
-
A.
bridge design bureau
chosen
A bridge design bureau is a specialized engineering organization responsible for planning, analyzing, and designing bridge structures to meet safety, functionality, and aesthetic requirements.
-
B.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
C.
bridge design standard
A bridge design standard is a formal set of technical requirements, guidelines, and criteria that govern the safe, durable, and efficient planning, analysis, and construction of bridges.
-
D.
bridge structure
A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
-
E.
bridge builder
A bridge builder is a professional responsible for designing, planning, and constructing bridges that safely span physical obstacles such as rivers, valleys, or roads.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e2db934819095556760c7d85e4d |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:22 p.m.