Triple

T22009905
Position Surface form Disambiguated ID Type / Status
Subject Waddell & Harrington E543547 entity
Predicate instanceOf P0 FINISHED
Object bridge design firm C25896 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge design firm
Context triple: [Waddell & Harrington, instanceOf, bridge design firm]
  • A. bridge design bureau chosen
    A bridge design bureau is a specialized engineering organization responsible for planning, analyzing, and designing bridge structures to meet safety, functionality, and aesthetic requirements.
  • B. bridge construction company
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • C. bridge design standard
    A bridge design standard is a formal set of technical requirements, guidelines, and criteria that govern the safe, durable, and efficient planning, analysis, and construction of bridges.
  • D. bridge structure
    A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
  • E. bridge builder
    A bridge builder is a professional responsible for designing, planning, and constructing bridges that safely span physical obstacles such as rivers, valleys, or roads.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2db934819095556760c7d85e4d completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:22 p.m.