Triple
T22008288
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Agreement on an International Energy Program |
E543507
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multilateral energy agreement |
C824
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multilateral energy agreement Context triple: [Agreement on an International Energy Program, instanceOf, multilateral energy agreement]
-
A.
international agreement
chosen
An international agreement is a formal, negotiated arrangement between two or more sovereign states or international organizations that creates binding obligations under international law.
-
B.
bilateral diplomatic agreement
A bilateral diplomatic agreement is a formal, negotiated arrangement between two sovereign states that defines mutual rights, obligations, and cooperative actions in specific areas of shared interest.
-
C.
cross-border energy infrastructure project
A cross-border energy infrastructure project is a coordinated initiative to plan, finance, build, and operate energy facilities—such as pipelines, transmission lines, or interconnectors—that physically link and serve multiple countries’ energy systems.
-
D.
bilateral military agreement
A bilateral military agreement is a formal pact between two states that outlines mutual defense commitments, security cooperation, and related military obligations and activities.
-
E.
multilateral negotiation process
A multilateral negotiation process is a structured series of interactions among three or more parties with differing interests, aimed at reaching mutually acceptable agreements through communication, bargaining, and compromise.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e2db934819095556760c7d85e4d |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:21 p.m.