Triple

T22008288
Position Surface form Disambiguated ID Type / Status
Subject Agreement on an International Energy Program E543507 entity
Predicate instanceOf P0 FINISHED
Object multilateral energy agreement C824 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multilateral energy agreement
Context triple: [Agreement on an International Energy Program, instanceOf, multilateral energy agreement]
  • A. international agreement chosen
    An international agreement is a formal, negotiated arrangement between two or more sovereign states or international organizations that creates binding obligations under international law.
  • B. bilateral diplomatic agreement
    A bilateral diplomatic agreement is a formal, negotiated arrangement between two sovereign states that defines mutual rights, obligations, and cooperative actions in specific areas of shared interest.
  • C. cross-border energy infrastructure project
    A cross-border energy infrastructure project is a coordinated initiative to plan, finance, build, and operate energy facilities—such as pipelines, transmission lines, or interconnectors—that physically link and serve multiple countries’ energy systems.
  • D. bilateral military agreement
    A bilateral military agreement is a formal pact between two states that outlines mutual defense commitments, security cooperation, and related military obligations and activities.
  • E. multilateral negotiation process
    A multilateral negotiation process is a structured series of interactions among three or more parties with differing interests, aimed at reaching mutually acceptable agreements through communication, bargaining, and compromise.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2db934819095556760c7d85e4d completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:21 p.m.