Triple
T22008258
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SPR Gulf Coast complex |
E543506
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Strategic Petroleum Reserve complex |
C18808
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Strategic Petroleum Reserve complex Context triple: [SPR Gulf Coast complex, instanceOf, Strategic Petroleum Reserve complex]
-
A.
ExxonMobil facility
An ExxonMobil facility is a physical site owned or operated by ExxonMobil where petroleum, natural gas, or related chemical products are explored, produced, processed, stored, or distributed.
-
B.
petroleum storage facility
A petroleum storage facility is an industrial site designed for the safe receipt, containment, handling, and distribution of crude oil and refined petroleum products in large tanks and associated infrastructure.
-
C.
national oil reserve
chosen
A national oil reserve is a government-controlled stockpile of crude oil maintained to ensure energy security, stabilize supply during disruptions, and support economic and strategic interests.
-
D.
crude oil storage facility
A crude oil storage facility is an industrial site designed to safely receive, hold, and dispatch large volumes of unrefined petroleum using tanks, containment systems, and associated transfer infrastructure.
-
E.
offshore petroleum export facility
An offshore petroleum export facility is a marine-based installation that receives, stores, and transfers produced oil or gas from offshore fields to tankers or pipelines for transport to onshore markets.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e2db934819095556760c7d85e4d |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:21 p.m.