Triple
T22001523
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | RCMP Musical Ride Centre |
E543336
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | equestrian training facility |
C16126
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: equestrian training facility Context triple: [RCMP Musical Ride Centre, instanceOf, equestrian training facility]
-
A.
equestrian center
chosen
An equestrian center is a facility dedicated to the boarding, training, riding, and care of horses, often offering lessons, competitions, and related services for riders of various skill levels.
-
B.
equestrian museum
An equestrian museum is a cultural institution dedicated to preserving, exhibiting, and interpreting artifacts, art, and historical materials related to horses, horsemanship, and equine sports.
-
C.
equestrian
An equestrian is a person who rides, trains, or competes with horses, often in disciplines such as show jumping, dressage, or eventing.
-
D.
Thoroughbred retirement farm
A Thoroughbred retirement farm is a specialized facility that provides long-term care, rehabilitation, and safe pasture living for retired Thoroughbred racehorses after their racing or breeding careers end.
-
E.
animal training facility
An animal training facility is a specialized environment where animals are systematically taught specific behaviors, skills, or tasks through structured programs and professional guidance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e2c814c8190837d072789000486 |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:20 p.m.