Triple

T2199440
Position Surface form Disambiguated ID Type / Status
Subject Ecuador Time E50453 entity
Predicate usedInBusinessHours P36914 FINISHED
Object Ecuadorian financial institutions LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ecuadorian financial institutions | Statement: [Ecuador Time, usedInBusinessHours, Ecuadorian financial institutions]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usedInBusinessHours
Context triple: [Ecuador Time, usedInBusinessHours, Ecuadorian financial institutions]
  • A. inOfficeDuring
    Indicates that an entity holds or occupies an office or position throughout a specified time period.
  • B. usedInWork
    Indicates that something (such as a concept, method, material, or component) is employed or applied within a particular work, project, or creation.
  • C. typicalBusinessHourStartLocalTime
    Indicates the local time at which a business’s normal operating hours typically begin.
  • D. isWorkHoliday
    Indicates that a given day is designated as a non-working public or company holiday.
  • E. usedBetween
    Indicates that something serves as a means, medium, or shared resource connecting or operating jointly between two entities.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b044ab48190add007487680f009 completed March 4, 2026, 7:41 p.m.
NER Named-entity recognition batch_69abbf9e99f08190892d34485c8f2f25 completed March 7, 2026, 6:03 a.m.
PD Predicate disambiguation batch_69abbda706f4819094de73e1d1d1f539 completed March 7, 2026, 5:54 a.m.
PDg Predicate description generation batch_69abbf35c994819088a093c412931de4 completed March 7, 2026, 6:01 a.m.
Created at: March 4, 2026, 7:46 p.m.