Triple

T21988769
Position Surface form Disambiguated ID Type / Status
Subject Long Shutdown 1 E543030 entity
Predicate partOf P40 FINISHED
Object Large Hadron Collider operational cycle NE GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Large Hadron Collider operational cycle
Context triple: [Long Shutdown 1, partOf, Large Hadron Collider operational cycle]
  • A. CERN LHC Run 2 era
    The CERN LHC Run 2 era was the second major operational period of the Large Hadron Collider, marked by higher collision energies and intensities that enabled a broad range of precision measurements and searches for new physics.
  • B. LHC Run 4
    LHC Run 4 is a planned future operating period of CERN’s Large Hadron Collider that will follow Run 3 and feature upgraded capabilities for higher-intensity particle collisions and expanded physics research.
  • C. Large Hadron Collider chosen
    The Large Hadron Collider is the world’s largest and most powerful particle accelerator, used to smash subatomic particles together at unprecedented energies to study fundamental physics, including the Higgs boson.
  • D. LHC Run 3
    LHC Run 3 is the third major data-taking period of the Large Hadron Collider, featuring higher collision energies and intensities to enable new physics searches and precision measurements.
  • E. LHC Run 1
    LHC Run 1 was the first operational period of the Large Hadron Collider (2009–2013), during which it delivered proton–proton and heavy-ion collisions that led to major discoveries including the Higgs boson.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c48136b081908831fa907cc02e18 completed April 16, 2026, 11:14 a.m.
Created at: April 16, 2026, 8:05 p.m.