Triple

T21988768
Position Surface form Disambiguated ID Type / Status
Subject Long Shutdown 1 E543030 entity
Predicate instanceOf P0 FINISHED
Object CERN maintenance period C45619 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: CERN maintenance period
Context triple: [Long Shutdown 1, instanceOf, CERN maintenance period]
  • A. operational period of the Large Hadron Collider
    The operational period of the Large Hadron Collider is the span of time during which the accelerator is actively running experiments, colliding particles, and collecting data under defined technical and safety conditions.
  • B. CERN experiment
    A CERN experiment is a large-scale, collaborative scientific investigation conducted at CERN’s particle physics facilities to study fundamental particles and forces using high-energy collisions and advanced detectors.
  • C. CERN status category
    A CERN status category represents a classification of an individual's or entity's formal relationship, role, and associated rights within the CERN organization.
  • D. LHC run
    An LHC run is a defined operational period of the Large Hadron Collider during which proton or ion beams are circulated and collided under specific energy and luminosity conditions to collect experimental data.
  • E. CERN accelerator complex component
    A CERN accelerator complex component is a specialized physical or control-system element—such as magnets, RF cavities, beamlines, detectors, or power and cooling infrastructure—that collectively enables the production, acceleration, steering, and monitoring of particle beams for experimental research.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c48136b081908831fa907cc02e18 completed April 16, 2026, 11:14 a.m.
Created at: April 16, 2026, 8:05 p.m.