Triple

T21983278
Position Surface form Disambiguated ID Type / Status
Subject WebAssembly.compile E542892 entity
Predicate compilationStage P4975 FINISHED
Object ahead-of-time compilation of WebAssembly binary LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ahead-of-time compilation of WebAssembly binary | Statement: [WebAssembly.compile, compilationStage, ahead-of-time compilation of WebAssembly binary]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: compilationStage
Context triple: [WebAssembly.compile, compilationStage, ahead-of-time compilation of WebAssembly binary]
  • A. compilation
    Indicates the process or result of collecting and assembling various items, works, or elements into a single organized whole.
  • B. compilationType chosen
    Indicates the specific method or mode by which something is compiled or assembled into a final form.
  • C. compilationStatus
    Indicates the current state or outcome of a compilation process for a given entity (e.g., whether it is pending, in progress, successful, or failed).
  • D. compilationContext
    Indicates the situational or environmental conditions under which something is compiled, such as the tools, settings, or parameters used during the compilation process.
  • E. laterCompiledAs
    Indicates that one work, version, or material was subsequently gathered, edited, or assembled into another compiled work.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c48136b081908831fa907cc02e18 completed April 16, 2026, 11:14 a.m.
NER Named-entity recognition batch_69f1270629588190aea32fbe630e4cba completed April 28, 2026, 9:30 p.m.
PD Predicate disambiguation batch_69e6f6154e408190acc5b2c278acaff4 completed April 21, 2026, 3:59 a.m.
Created at: April 16, 2026, 8:04 p.m.