Triple

T21978414
Position Surface form Disambiguated ID Type / Status
Subject Bariri Dam E542769 entity
Predicate partOf P40 FINISHED
Object Tietê hydroelectric complex NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tietê hydroelectric complex | Statement: [Bariri Dam, partOf, Tietê hydroelectric complex]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tietê hydroelectric complex
Context triple: [Bariri Dam, partOf, Tietê hydroelectric complex]
  • A. Paulo Afonso Hydroelectric Complex
    The Paulo Afonso Hydroelectric Complex is a major Brazilian hydroelectric power facility on the São Francisco River, known for its large cascade of dams and significant contribution to the country’s electricity supply.
  • B. Belo Monte Dam
    The Belo Monte Dam is a massive hydroelectric complex in Brazil’s Amazon region, known for its high power capacity and significant environmental and social controversy.
  • C. Paraná River hydroelectric system
    The Paraná River hydroelectric system is a network of large dams and power stations along the Paraná River that collectively form one of South America’s most important sources of renewable electricity.
  • D. Usina Hidrelétrica de Três Irmãos chosen
    Usina Hidrelétrica de Três Irmãos is a major hydroelectric power plant and dam complex located on the Tietê River in the state of São Paulo, Brazil.
  • E. Santo Antônio Dam
    Santo Antônio Dam is a large hydroelectric power plant in Brazil, built on the Madeira River near Porto Velho to generate electricity as part of the Madeira River energy complex.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c48070988190909db97667b9a0ac completed April 16, 2026, 11:14 a.m.
NER Named-entity recognition batch_69f1248a60708190a9aa8b9b7738c261 completed April 28, 2026, 9:20 p.m.
Created at: April 16, 2026, 8:03 p.m.