Triple

T21959667
Position Surface form Disambiguated ID Type / Status
Subject A41 motorway (Portugal) E542289 entity
Predicate connectsTo P845 FINISHED
Object N15 road (Portugal) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N15 road (Portugal) | Statement: [A41 motorway (Portugal), connectsTo, N15 road (Portugal)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: N15 road (Portugal)
Context triple: [A41 motorway (Portugal), connectsTo, N15 road (Portugal)]
  • A. A15 motorway (Portugal)
    The A15 motorway in Portugal is a key highway linking the coastal city of Caldas da Rainha to the interior city of Santarém, improving regional connectivity between the A8 and A1 motorways.
  • B. A14 motorway (Portugal)
    The A14 motorway in Portugal is a key highway linking the coastal city of Figueira da Foz to Coimbra and the A1, facilitating regional and long-distance traffic in the central part of the country.
  • C. A13 motorway (Portugal)
    The A13 motorway in Portugal is a major north–south toll road linking the central regions of the country while providing an alternative inland route to the main coastal motorways.
  • D. A12 motorway (Portugal)
    The A12 motorway in Portugal is a key north–south expressway linking Lisbon to Setúbal via the Vasco da Gama Bridge, helping to divert traffic from the capital’s central routes.
  • E. A18 motorway (Portugal)
    The A18 motorway in Portugal is a regional highway that forms part of the country’s national road network, providing a fast connection between inland urban areas and major routes.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: N15 road (Portugal)
Target entity description: The N15 road in Portugal is a national highway that serves as an important regional route in the north of the country, linking several towns and providing access to major motorways.
  • A. A15 motorway (Portugal)
    The A15 motorway in Portugal is a key highway linking the coastal city of Caldas da Rainha to the interior city of Santarém, improving regional connectivity between the A8 and A1 motorways.
  • B. A14 motorway (Portugal)
    The A14 motorway in Portugal is a key highway linking the coastal city of Figueira da Foz to Coimbra and the A1, facilitating regional and long-distance traffic in the central part of the country.
  • C. A13 motorway (Portugal)
    The A13 motorway in Portugal is a major north–south toll road linking the central regions of the country while providing an alternative inland route to the main coastal motorways.
  • D. A12 motorway (Portugal)
    The A12 motorway in Portugal is a key north–south expressway linking Lisbon to Setúbal via the Vasco da Gama Bridge, helping to divert traffic from the capital’s central routes.
  • E. A18 motorway (Portugal)
    The A18 motorway in Portugal is a regional highway that forms part of the country’s national road network, providing a fast connection between inland urban areas and major routes.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c47fab1081908dc74a6545dbb051 completed April 16, 2026, 11:14 a.m.
NER Named-entity recognition batch_69f12454a290819094d4b56547816e3f completed April 28, 2026, 9:19 p.m.
Created at: April 16, 2026, 8 p.m.