Triple

T21959143
Position Surface form Disambiguated ID Type / Status
Subject Harriman Dam E542275 entity
Predicate owner P347 FINISHED
Object Great River Hydro LLC NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Great River Hydro LLC | Statement: [Harriman Dam, owner, Great River Hydro LLC]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Great River Hydro LLC
Context triple: [Harriman Dam, owner, Great River Hydro LLC]
  • A. Grand River Dam Authority
    The Grand River Dam Authority is a state-owned public power utility in Oklahoma that generates and transmits electricity, manages water resources, and oversees major hydroelectric and recreational lakes.
  • B. Columbia Power Corporation
    Columbia Power Corporation is a British Columbia Crown corporation that develops, owns, and operates hydroelectric power projects in the Columbia River Basin.
  • C. Washington Water Power Company
    Washington Water Power Company is a historic electric utility based in Spokane, Washington, known for developing hydroelectric power projects in the Pacific Northwest.
  • D. Canadian Hydro Developers
    Canadian Hydro Developers was a Canadian renewable energy company focused on developing and operating wind, hydro, and other clean power projects.
  • E. Great Western Power Company
    Great Western Power Company was an early 20th-century California electric utility company known for developing hydroelectric projects and infrastructure in the Sierra Nevada region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Great River Hydro LLC
Target entity description: Great River Hydro LLC is a U.S.-based renewable energy company that owns and operates hydroelectric power facilities in the New England region.
  • A. Grand River Dam Authority
    The Grand River Dam Authority is a state-owned public power utility in Oklahoma that generates and transmits electricity, manages water resources, and oversees major hydroelectric and recreational lakes.
  • B. Columbia Power Corporation
    Columbia Power Corporation is a British Columbia Crown corporation that develops, owns, and operates hydroelectric power projects in the Columbia River Basin.
  • C. Washington Water Power Company
    Washington Water Power Company is a historic electric utility based in Spokane, Washington, known for developing hydroelectric power projects in the Pacific Northwest.
  • D. Canadian Hydro Developers
    Canadian Hydro Developers was a Canadian renewable energy company focused on developing and operating wind, hydro, and other clean power projects.
  • E. Great Western Power Company
    Great Western Power Company was an early 20th-century California electric utility company known for developing hydroelectric projects and infrastructure in the Sierra Nevada region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c47fab1081908dc74a6545dbb051 completed April 16, 2026, 11:14 a.m.
NER Named-entity recognition batch_69f1244204f081909742d4fe138610d6 completed April 28, 2026, 9:18 p.m.
Created at: April 16, 2026, 8 p.m.