Triple

T21953858
Position Surface form Disambiguated ID Type / Status
Subject Asker Station E542132 entity
Predicate railwayLine P848 FINISHED
Object Drammen Line NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Drammen Line | Statement: [Asker Station, railwayLine, Drammen Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Drammen Line
Context triple: [Asker Station, railwayLine, Drammen Line]
  • A. Drammen Line chosen
    The Drammen Line is a major Norwegian railway route connecting Oslo with the city of Drammen and serving as an important commuter and intercity corridor in the Oslo region.
  • B. Drammen–Hønefoss line
    The Drammen–Hønefoss line is a Norwegian railway section connecting Drammen and Hønefoss that forms part of the main rail route between Oslo and Bergen.
  • C. Gjøvik Line
    The Gjøvik Line is a Norwegian railway route connecting Oslo with the town of Gjøvik through the inland districts north of the capital.
  • D. Numedal Line
    The Numedal Line is a Norwegian railway route running through the Numedal valley, historically used for passenger and freight transport and now partly operated as a heritage and tourist line.
  • E. Spikkestad Line
    The Spikkestad Line is a Norwegian railway line in the Oslo region that primarily serves as a commuter route connecting suburban areas to the capital.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c47ef0e48190a50e1bcc43f4b3fd completed April 16, 2026, 11:14 a.m.
NER Named-entity recognition batch_69f1243dfb4081909bc7a722843ffea7 completed April 28, 2026, 9:18 p.m.
Created at: April 16, 2026, 7:59 p.m.