Triple

T21948854
Position Surface form Disambiguated ID Type / Status
Subject Zhengzhou Metro E542007 entity
Predicate hasLine P35 FINISHED
Object Zhengzhou Metro Line 3 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zhengzhou Metro Line 3 | Statement: [Zhengzhou Metro, hasLine, Zhengzhou Metro Line 3]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Zhengzhou Metro Line 3
Context triple: [Zhengzhou Metro, hasLine, Zhengzhou Metro Line 3]
  • A. Zhengzhou Metro
    Zhengzhou Metro is the rapid transit system serving the city of Zhengzhou, providing urban rail transportation across the capital of China’s Henan Province.
  • B. Zhengzhou–Xinzheng Airport intercity railway
    The Zhengzhou–Xinzheng Airport intercity railway is a dedicated rapid transit rail line in Henan, China, providing fast passenger service between central Zhengzhou and Zhengzhou Xinzheng International Airport.
  • C. Zhengzhou–Jiaozuo intercity railway
    The Zhengzhou–Jiaozuo intercity railway is a high-speed commuter rail line in Henan Province, China, providing rapid passenger service between the cities of Zhengzhou and Jiaozuo as part of the regional intercity rail network.
  • D. Liuohe Line
    The Liuohe Line is a regional railway branch in Taiwan that connects local communities to the main Taiwan Railways network.
  • E. Chengdu Metro Line 3
    Chengdu Metro Line 3 is a major rapid transit line in Chengdu’s metro system that connects key commercial, residential, and cultural areas across the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Zhengzhou Metro Line 3
Target entity description: Zhengzhou Metro Line 3 is a rapid transit line in Zhengzhou, China, forming part of the city's expanding urban rail network and connecting key districts across the metropolitan area.
  • A. Zhengzhou Metro
    Zhengzhou Metro is the rapid transit system serving the city of Zhengzhou, providing urban rail transportation across the capital of China’s Henan Province.
  • B. Zhengzhou–Xinzheng Airport intercity railway
    The Zhengzhou–Xinzheng Airport intercity railway is a dedicated rapid transit rail line in Henan, China, providing fast passenger service between central Zhengzhou and Zhengzhou Xinzheng International Airport.
  • C. Zhengzhou–Jiaozuo intercity railway
    The Zhengzhou–Jiaozuo intercity railway is a high-speed commuter rail line in Henan Province, China, providing rapid passenger service between the cities of Zhengzhou and Jiaozuo as part of the regional intercity rail network.
  • D. Liuohe Line
    The Liuohe Line is a regional railway branch in Taiwan that connects local communities to the main Taiwan Railways network.
  • E. Chengdu Metro Line 3
    Chengdu Metro Line 3 is a major rapid transit line in Chengdu’s metro system that connects key commercial, residential, and cultural areas across the city.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c47ef0e48190a50e1bcc43f4b3fd completed April 16, 2026, 11:14 a.m.
NER Named-entity recognition batch_69f1243aed048190b4342899c83b38ec completed April 28, 2026, 9:18 p.m.
Created at: April 16, 2026, 7:58 p.m.