Triple
T21931333
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brock Commons Tallwood House |
E541573
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mass timber building |
C18026
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mass timber building Context triple: [Brock Commons Tallwood House, instanceOf, mass timber building]
-
A.
timber structure
chosen
A timber structure is a construction system in which the primary load-bearing framework is made from engineered or solid wood members connected to safely transfer loads to the foundation.
-
B.
reinforced concrete building
A reinforced concrete building is a structure whose load-bearing elements are made from concrete strengthened with embedded steel reinforcement to resist compression, tension, and shear forces.
-
C.
structural high
A structural high is a geologic feature where rock layers or strata are arched or uplifted relative to surrounding areas, often forming potential traps for hydrocarbons.
-
D.
reinforced concrete structure
A reinforced concrete structure is a construction system in which concrete is combined with embedded steel reinforcement to resist both compressive and tensile forces, providing strength, durability, and stability for buildings and infrastructure.
-
E.
building material
A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c47d74488190a15119108794a307 |
completed | April 16, 2026, 11:14 a.m. |
Created at: April 16, 2026, 7:47 p.m.