Triple
T21923390
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dual System of Rapid Transit |
E541377
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rapid transit expansion plan |
C35368
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rapid transit expansion plan Context triple: [Dual System of Rapid Transit, instanceOf, rapid transit expansion plan]
-
A.
rapid transit expansion project
chosen
A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
-
B.
light rail expansion project
A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
-
C.
rapid transit network
A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
-
D.
regional transport plan
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
-
E.
commuter rail line extension
A commuter rail line extension is an added segment of track and associated stations that lengthens an existing suburban passenger rail route to serve new areas and increase connectivity.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c47d74488190a15119108794a307 |
completed | April 16, 2026, 11:14 a.m. |
Created at: April 16, 2026, 7:45 p.m.