Triple

T21904406
Position Surface form Disambiguated ID Type / Status
Subject Final System Plan E540896 entity
Predicate instanceOf P0 FINISHED
Object railroad restructuring plan C17897 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railroad restructuring plan
Context triple: [Final System Plan, instanceOf, railroad restructuring plan]
  • A. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • B. railroad syndicate
    A railroad syndicate is a consortium of investors, financiers, or companies that collaborate to fund, construct, control, or operate railroad lines, often to consolidate power, reduce competition, or coordinate large-scale rail projects.
  • C. railway policy implementation
    Railway policy implementation is the process of translating rail-related laws, regulations, and strategic plans into concrete operational actions, projects, and standards across the railway system.
  • D. defunct railroad
    A defunct railroad is a former railway company or line that has ceased operations, often leaving behind abandoned tracks, rights-of-way, or repurposed infrastructure.
  • E. railway modernisation project chosen
    A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c47b4e8c81908c8076eaa4c8e4f2 completed April 16, 2026, 11:14 a.m.
Created at: April 16, 2026, 7:29 p.m.