Triple
T21904221
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vienna–Hamburg |
E540891
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international overnight rail connection |
C20620
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international overnight rail connection Context triple: [Vienna–Hamburg, instanceOf, international overnight rail connection]
-
A.
international railway
chosen
An international railway is a rail transport system or route that connects and facilitates the movement of passengers and freight between two or more countries across their national borders.
-
B.
intercity coach
An intercity coach is a long-distance, high-capacity passenger vehicle designed for comfortable travel between cities, typically featuring reserved seating, luggage storage, and onboard amenities.
-
C.
Interrail product
An Interrail product is a flexible rail pass that allows travelers, primarily European residents, to take multiple train journeys across participating European countries within a specified time period.
-
D.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
E.
intercity coach service
An intercity coach service is a scheduled, long-distance bus transportation system that carries passengers between cities or towns, typically offering reserved seating, luggage capacity, and limited intermediate stops.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c47b4e8c81908c8076eaa4c8e4f2 |
completed | April 16, 2026, 11:14 a.m. |
Created at: April 16, 2026, 7:29 p.m.