Triple

T21880070
Position Surface form Disambiguated ID Type / Status
Subject Fort Hubberstone E540253 entity
Predicate instanceOf P0 FINISHED
Object Palmerston Fort C30577 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Palmerston Fort
Context triple: [Fort Hubberstone, instanceOf, Palmerston Fort]
  • A. royal dockyard
    A royal dockyard is a state-owned naval shipbuilding and repair facility historically operated by a monarchy to construct, maintain, and supply its warships and maritime infrastructure.
  • B. granite fort chosen
    A granite fort is a heavily fortified structure built primarily from durable granite stone, designed to provide long-lasting defense and protection.
  • C. royal pavilion
    A royal pavilion is an ornate, often temporary or semi-permanent structure used by royalty for ceremonial, recreational, or representational purposes, typically featuring luxurious design and prominent placement within palace grounds or formal landscapes.
  • D. hill fort
    A hill fort is a fortified settlement built on elevated ground, typically featuring defensive earthworks, walls, and ditches to control and protect the surrounding area.
  • E. Royal Marines training centre
    A Royal Marines training centre is a specialized military facility where recruits and serving personnel undergo intensive physical, tactical, and amphibious training to prepare for operational deployment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c479a98081908ce333853fdd4348 completed April 16, 2026, 11:14 a.m.
Created at: April 16, 2026, 7:04 p.m.