Triple

T21838083
Position Surface form Disambiguated ID Type / Status
Subject José F. Ribas Refuge E539172 entity
Predicate associatedWith P37 FINISHED
Object Cotopaxi standard normal route NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cotopaxi standard normal route | Statement: [José F. Ribas Refuge, associatedWith, Cotopaxi standard normal route]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cotopaxi standard normal route
Context triple: [José F. Ribas Refuge, associatedWith, Cotopaxi standard normal route]
  • A. Normal Route on Aconcagua
    The Normal Route on Aconcagua is the most commonly used, non-technical ascent path to the mountain’s summit, favored for its relatively easier terrain and logistical accessibility.
  • B. Chimborazo summit expeditions
    Chimborazo summit expeditions are mountaineering climbs aiming to reach the peak of Ecuador’s Chimborazo volcano, one of the highest and most prominent mountains in the Andes.
  • C. Machame Route
    Machame Route is one of the most popular and scenic trekking paths used by climbers to ascend Mount Kilimanjaro in Tanzania.
  • D. Timpohon–Low’s Peak route
    The Timpohon–Low’s Peak route is the most commonly used and well-established trail for climbers ascending from the Timpohon Gate to the summit of Mount Kinabalu in Sabah, Malaysia.
  • E. Aconcagua west face
    Aconcagua west face is the imposing, often snow-covered western slope of Aconcagua, the highest mountain in the Americas, known for its dramatic rock walls and challenging climbing routes.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Cotopaxi standard normal route
Target entity description: The Cotopaxi standard normal route is the most commonly used mountaineering ascent line on Ecuador’s Cotopaxi volcano, typically starting from the José F. Ribas Refuge and following glaciated slopes to the summit.
  • A. Normal Route on Aconcagua
    The Normal Route on Aconcagua is the most commonly used, non-technical ascent path to the mountain’s summit, favored for its relatively easier terrain and logistical accessibility.
  • B. Chimborazo summit expeditions
    Chimborazo summit expeditions are mountaineering climbs aiming to reach the peak of Ecuador’s Chimborazo volcano, one of the highest and most prominent mountains in the Andes.
  • C. Machame Route
    Machame Route is one of the most popular and scenic trekking paths used by climbers to ascend Mount Kilimanjaro in Tanzania.
  • D. Timpohon–Low’s Peak route
    The Timpohon–Low’s Peak route is the most commonly used and well-established trail for climbers ascending from the Timpohon Gate to the summit of Mount Kinabalu in Sabah, Malaysia.
  • E. Aconcagua west face
    Aconcagua west face is the imposing, often snow-covered western slope of Aconcagua, the highest mountain in the Americas, known for its dramatic rock walls and challenging climbing routes.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c475cda88190987d08f23caebdc1 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f0a7a9a36881909eb917f12d061ba9 completed April 28, 2026, 12:27 p.m.
Created at: April 16, 2026, 6:55 p.m.