Triple
T2182958
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Concourse B Station |
E49086
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | airport people mover station |
C538
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: airport people mover station Context triple: [Concourse B Station, instanceOf, airport people mover station]
-
A.
airport rail station
An airport rail station is a transportation facility that directly connects an airport to regional or long-distance rail networks, enabling passengers to transfer efficiently between air and train travel.
-
B.
people mover system
chosen
A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
-
C.
rapid transit station
A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
-
D.
light-rail station
A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
-
E.
AeroTrain station
An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88aa72d348190a9544bb5b8a4e71d |
completed | March 4, 2026, 7:40 p.m. |
Created at: March 4, 2026, 7:45 p.m.