Triple

T21828827
Position Surface form Disambiguated ID Type / Status
Subject Lempster, New Hampshire E538930 entity
Predicate hasWindFarm P34328 FINISHED
Object Lempster Mountain wind farm NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lempster Mountain wind farm | Statement: [Lempster, New Hampshire, hasWindFarm, Lempster Mountain wind farm]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lempster Mountain wind farm
Context triple: [Lempster, New Hampshire, hasWindFarm, Lempster Mountain wind farm]
  • A. Mars Hill Mountain wind farm
    Mars Hill Mountain wind farm is a commercial wind energy facility in northern Maine that generates electricity using turbines installed along Mars Hill Mountain’s ridgeline.
  • B. Woodlawn wind farm
    Woodlawn wind farm is a renewable energy facility in New South Wales, Australia, consisting of multiple wind turbines that generate electricity for the regional power grid.
  • C. Cowley Ridge Wind Farm
    Cowley Ridge Wind Farm was one of Canada’s first commercial wind power projects, located near Pincher Creek in southern Alberta and known for pioneering large-scale wind energy development in the country.
  • D. Tehachapi Pass Wind Farm
    Tehachapi Pass Wind Farm is a large wind energy facility in California and one of the nation’s major hubs for wind power generation.
  • E. San Gorgonio Pass wind farm
    San Gorgonio Pass wind farm is a major wind energy facility in Southern California, known for its large concentration of wind turbines that harness strong mountain pass winds to generate electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lempster Mountain wind farm
Target entity description: Lempster Mountain wind farm is a commercial wind power facility in Lempster, New Hampshire, known as one of the state’s first major wind energy projects.
  • A. Mars Hill Mountain wind farm
    Mars Hill Mountain wind farm is a commercial wind energy facility in northern Maine that generates electricity using turbines installed along Mars Hill Mountain’s ridgeline.
  • B. Woodlawn wind farm
    Woodlawn wind farm is a renewable energy facility in New South Wales, Australia, consisting of multiple wind turbines that generate electricity for the regional power grid.
  • C. Cowley Ridge Wind Farm
    Cowley Ridge Wind Farm was one of Canada’s first commercial wind power projects, located near Pincher Creek in southern Alberta and known for pioneering large-scale wind energy development in the country.
  • D. Tehachapi Pass Wind Farm
    Tehachapi Pass Wind Farm is a large wind energy facility in California and one of the nation’s major hubs for wind power generation.
  • E. San Gorgonio Pass wind farm
    San Gorgonio Pass wind farm is a major wind energy facility in Southern California, known for its large concentration of wind turbines that harness strong mountain pass winds to generate electricity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c475cda88190987d08f23caebdc1 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f091344c848190b1675432a8c255f2 completed April 28, 2026, 10:51 a.m.
Created at: April 16, 2026, 6:54 p.m.