Triple

T21820352
Position Surface form Disambiguated ID Type / Status
Subject Machhu Dam E538708 entity
Predicate hasPart P35 FINISHED
Object Machhu Dam II NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Machhu Dam II | Statement: [Machhu Dam, hasPart, Machhu Dam II]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Machhu Dam II
Context triple: [Machhu Dam, hasPart, Machhu Dam II]
  • A. Machhu Dam chosen
    Machhu Dam is a major irrigation and flood-control dam on the Machhu River near Morbi in Gujarat, India, historically known for the catastrophic failure of one of its structures in 1979.
  • B. Pandoh Dam
    Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
  • C. Mula Dam
    Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
  • D. Naghlu Dam
    Naghlu Dam is a major hydroelectric and irrigation dam in Afghanistan, located east of Kabul and serving as a key source of power and water management for the region.
  • E. Murum Dam
    Murum Dam is a major hydroelectric dam located in the interior of Sarawak, Malaysia, contributing significantly to the region’s power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c475038c8190abb9b1a20eb8ff50 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f0912d414c81909c109c3e45b6e7d2 completed April 28, 2026, 10:51 a.m.
Created at: April 16, 2026, 6:54 p.m.