Triple

T21804918
Position Surface form Disambiguated ID Type / Status
Subject European Cup Winners’ Cup 1969–70 with Manchester City E538325 entity
Predicate instanceOf P0 FINISHED
Object football tournament campaign C45330 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: football tournament campaign
Context triple: [European Cup Winners’ Cup 1969–70 with Manchester City, instanceOf, football tournament campaign]
  • A. soccer tournament
    A soccer tournament is an organized competition in which multiple soccer teams play a series of scheduled matches, typically in group and/or knockout formats, to determine an overall champion.
  • B. FIFA World Cup campaign
    A FIFA World Cup campaign is the organized, multi-stage effort by a national football team and its association to qualify for, prepare for, and compete in a specific edition of the FIFA World Cup, encompassing strategic planning, player selection, training, matches, and promotional activities.
  • C. football competition organizer
    A football competition organizer is an entity responsible for planning, coordinating, and managing all aspects of a football tournament or league, including scheduling, regulations, logistics, and stakeholder communication.
  • D. football tournament stage
    A football tournament stage is a defined phase within a competition, such as group play or knockout rounds, in which a set of matches is organized to determine which teams progress further in the tournament.
  • E. sports tournament
    A sports tournament is an organized competition in which multiple teams or individuals play a series of scheduled matches under defined rules to determine an overall winner or ranking.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c473f0f8819086c9d1b4a143bd67 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:53 p.m.