Triple
T21796557
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Helix City |
E538108
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | architectural proposal |
C41457
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: architectural proposal Context triple: [Helix City, instanceOf, architectural proposal]
-
A.
architectural design
Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
-
B.
architectural concept
chosen
An architectural concept is a unifying idea or guiding principle that shapes the form, function, and experience of a building or space.
-
C.
architectural work
An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
-
D.
visionary architecture project
A visionary architecture project is a forward-thinking, often speculative design concept that reimagines the built environment through innovative forms, technologies, and social or ecological paradigms beyond conventional practice.
-
E.
architectural development
Architectural development is the iterative process of designing, refining, and evolving a system’s structure to meet functional, technical, and stakeholder requirements over time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c4733f4081909a86622e7e6d15d2 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:53 p.m.