Triple

T21794557
Position Surface form Disambiguated ID Type / Status
Subject Dalj E538059 entity
Predicate hasLandmark P105 FINISHED
Object Dalj Hydroelectric Power Plant (nearby on the Danube) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dalj Hydroelectric Power Plant (nearby on the Danube) | Statement: [Dalj, hasLandmark, Dalj Hydroelectric Power Plant (nearby on the Danube)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dalj Hydroelectric Power Plant (nearby on the Danube)
Context triple: [Dalj, hasLandmark, Dalj Hydroelectric Power Plant (nearby on the Danube)]
  • A. Višegrad Hydroelectric Power Plant
    The Višegrad Hydroelectric Power Plant is a major hydroelectric facility on the Drina River in eastern Bosnia and Herzegovina, known for its significant contribution to regional electricity production.
  • B. Orava Hydroelectric Power Plant
    Orava Hydroelectric Power Plant is a Slovak hydroelectric facility that generates electricity using water from the Orava Reservoir in northern Slovakia.
  • C. Persenbeug-Gottsdorf Danube power plant
    The Persenbeug-Gottsdorf Danube power plant is a major run-of-river hydroelectric facility on the Danube River in Austria, providing renewable electricity and serving as an important component of the country’s power grid.
  • D. Svetogorsk hydropower plant
    Svetogorsk hydropower plant is a hydroelectric power station located on the Vuoksi River in Russia, generating electricity by harnessing the river’s flow.
  • E. Slapy Hydroelectric Power Plant
    Slapy Hydroelectric Power Plant is a hydroelectric facility on the Vltava River in the Czech Republic that generates electricity using water from the Slapy Reservoir.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Dalj Hydroelectric Power Plant (nearby on the Danube)
Target entity description: Dalj Hydroelectric Power Plant (nearby on the Danube) is a river-based hydroelectric facility on the Danube River near the town of Dalj, generating electricity from the river’s flow.
  • A. Višegrad Hydroelectric Power Plant
    The Višegrad Hydroelectric Power Plant is a major hydroelectric facility on the Drina River in eastern Bosnia and Herzegovina, known for its significant contribution to regional electricity production.
  • B. Orava Hydroelectric Power Plant
    Orava Hydroelectric Power Plant is a Slovak hydroelectric facility that generates electricity using water from the Orava Reservoir in northern Slovakia.
  • C. Persenbeug-Gottsdorf Danube power plant
    The Persenbeug-Gottsdorf Danube power plant is a major run-of-river hydroelectric facility on the Danube River in Austria, providing renewable electricity and serving as an important component of the country’s power grid.
  • D. Svetogorsk hydropower plant
    Svetogorsk hydropower plant is a hydroelectric power station located on the Vuoksi River in Russia, generating electricity by harnessing the river’s flow.
  • E. Slapy Hydroelectric Power Plant
    Slapy Hydroelectric Power Plant is a hydroelectric facility on the Vltava River in the Czech Republic that generates electricity using water from the Slapy Reservoir.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c4733f4081909a86622e7e6d15d2 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f0622329b08190b8cd9be714aca456 completed April 28, 2026, 7:30 a.m.
Created at: April 16, 2026, 6:53 p.m.