Triple

T21756665
Position Surface form Disambiguated ID Type / Status
Subject Rio Protocol E537057 entity
Predicate subsequentDispute P144458 FINISHED
Object Ecuador later questioned the applicability of parts of the protocol NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ecuador later questioned the applicability of parts of the protocol | Statement: [Rio Protocol, subsequentDispute, Ecuador later questioned the applicability of parts of the protocol]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ecuador later questioned the applicability of parts of the protocol
Context triple: [Rio Protocol, subsequentDispute, Ecuador later questioned the applicability of parts of the protocol]
  • A. Ecuador–European Union relations
    Ecuador–European Union relations encompass the diplomatic, political, and economic ties between Ecuador and the EU, including trade agreements, development cooperation, and dialogue on issues such as human rights and regional integration.
  • B. Ecuadorian–Peruvian territorial disputes chosen
    The Ecuadorian–Peruvian territorial disputes were a long-running series of border conflicts between Ecuador and Peru over Amazonian and Andean territories, marked by intermittent wars, skirmishes, and diplomatic crises throughout the 19th and 20th centuries.
  • C. National Security Council of Ecuador
    The National Security Council of Ecuador is a high-level governmental body responsible for coordinating and formulating the country’s national security and defense policies.
  • D. Contentious Electoral Tribunal of Ecuador
    The Contentious Electoral Tribunal of Ecuador is a judicial body responsible for resolving electoral disputes and ensuring the legality and fairness of electoral processes in the country.
  • E. Public Prosecutor's Office of Ecuador
    The Public Prosecutor's Office of Ecuador is the national authority responsible for directing criminal investigations and prosecuting crimes on behalf of the state within the Ecuadorian justice system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: subsequentDispute
Context triple: [Rio Protocol, subsequentDispute, Ecuador later questioned the applicability of parts of the protocol]
  • A. laterDisputedBy chosen
    Indicates that a previously made claim, statement, or assertion is subsequently challenged, questioned, or contradicted by another party.
  • B. hasDisputeWith
    Indicates that there is a conflict, disagreement, or contested issue between two entities.
  • C. disputeIssue
    Indicates that there is a disagreement or conflict specifically concerning a particular issue or point of contention.
  • D. significantDispute
    Indicates a serious, often prolonged disagreement or conflict exists between the involved entities.
  • E. disputeBegan
    Indicates that a conflict or disagreement between parties was initiated or came into existence at a specific point in time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46eab808190b848242d63a17c47 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f01d8ea04c8190a8c4fa43b3f23935 completed April 28, 2026, 2:38 a.m.
PD Predicate disambiguation batch_69e6969e46088190b13d6e9025775ea3 completed April 20, 2026, 9:11 p.m.
Created at: April 16, 2026, 6:50 p.m.