Triple

T21749458
Position Surface form Disambiguated ID Type / Status
Subject Uri Hydroelectric Project E536873 entity
Predicate hasComponent P35 FINISHED
Object Uri-II Hydroelectric Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Uri-II Hydroelectric Station | Statement: [Uri Hydroelectric Project, hasComponent, Uri-II Hydroelectric Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Uri-II Hydroelectric Station
Context triple: [Uri Hydroelectric Project, hasComponent, Uri-II Hydroelectric Station]
  • A. Uri-I Hydroelectric Station
    Uri-I Hydroelectric Station is a major run-of-the-river power plant on the Jhelum River in Jammu and Kashmir, India, contributing significantly to the region’s hydroelectric generation.
  • B. Tinfos II Hydroelectric Power Station
    Tinfos II Hydroelectric Power Station is an early 20th-century Norwegian hydroelectric facility that played a key role in powering the industrial development of the Rjukan–Notodden region.
  • C. Er'tan Hydropower Station
    Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
  • D. Sima Hydroelectric Power Station
    The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
  • E. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Uri-II Hydroelectric Station
Target entity description: Uri-II Hydroelectric Station is a run-of-the-river hydroelectric power plant in Jammu and Kashmir, India, built on the Jhelum River to generate electricity as part of the larger Uri Hydroelectric Project.
  • A. Uri-I Hydroelectric Station
    Uri-I Hydroelectric Station is a major run-of-the-river power plant on the Jhelum River in Jammu and Kashmir, India, contributing significantly to the region’s hydroelectric generation.
  • B. Tinfos II Hydroelectric Power Station
    Tinfos II Hydroelectric Power Station is an early 20th-century Norwegian hydroelectric facility that played a key role in powering the industrial development of the Rjukan–Notodden region.
  • C. Er'tan Hydropower Station
    Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
  • D. Sima Hydroelectric Power Station
    The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
  • E. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46eab808190b848242d63a17c47 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f01a78bd908190b74e26ab1cc8788f completed April 28, 2026, 2:24 a.m.
Created at: April 16, 2026, 6:50 p.m.