Triple
T21749457
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Uri Hydroelectric Project |
E536873
|
entity |
| Predicate | hasComponent |
P35
|
FINISHED |
| Object | Uri-I Hydroelectric Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Uri-I Hydroelectric Station | Statement: [Uri Hydroelectric Project, hasComponent, Uri-I Hydroelectric Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Uri-I Hydroelectric Station Context triple: [Uri Hydroelectric Project, hasComponent, Uri-I Hydroelectric Station]
-
A.
Tash-Kumyr Hydroelectric Power Plant
Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
-
B.
Er'tan Hydropower Station
Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
-
C.
Kara-Köl Hydroelectric Power Station
Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
-
D.
Sima Hydroelectric Power Station
The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
-
E.
Khrami II Hydroelectric Power Plant
Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Uri-I Hydroelectric Station Target entity description: Uri-I Hydroelectric Station is a major run-of-the-river power plant on the Jhelum River in Jammu and Kashmir, India, contributing significantly to the region’s hydroelectric generation.
-
A.
Tash-Kumyr Hydroelectric Power Plant
Tash-Kumyr Hydroelectric Power Plant is a hydroelectric facility in Kyrgyzstan that generates electricity from the Naryn River as part of a cascade of dams and power stations.
-
B.
Er'tan Hydropower Station
Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
-
C.
Kara-Köl Hydroelectric Power Station
Kara-Köl Hydroelectric Power Station is a major hydroelectric facility in Kyrgyzstan that harnesses the Naryn River to generate electricity for the region and the national grid.
-
D.
Sima Hydroelectric Power Station
The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
-
E.
Khrami II Hydroelectric Power Plant
Khrami II Hydroelectric Power Plant is a hydroelectric facility on the Khrami River in Georgia that generates electricity by harnessing the river’s flow through a dam-based power station.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c46eab808190b848242d63a17c47 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69f01a78bd908190b74e26ab1cc8788f |
completed | April 28, 2026, 2:24 a.m. |
Created at: April 16, 2026, 6:50 p.m.