Triple

T21749094
Position Surface form Disambiguated ID Type / Status
Subject Hubli E536862 entity
Predicate hasBusService P3791 FINISHED
Object Hubli-Dharwad Bus Rapid Transit System NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hubli-Dharwad Bus Rapid Transit System | Statement: [Hubli, hasBusService, Hubli-Dharwad Bus Rapid Transit System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hubli-Dharwad Bus Rapid Transit System
Context triple: [Hubli, hasBusService, Hubli-Dharwad Bus Rapid Transit System]
  • A. Bangalore Metro
    Bangalore Metro is a rapid transit system serving the city of Bengaluru, India, providing an elevated and underground rail network to ease urban transportation and reduce traffic congestion.
  • B. Hyderabad Multi-Modal Transport System
    The Hyderabad Multi-Modal Transport System is a suburban rail network in Hyderabad, India, designed to provide efficient, high-frequency commuter connectivity across the metropolitan region.
  • C. Surat Bus Rapid Transit System
    Surat Bus Rapid Transit System is a dedicated high-capacity bus network in Surat, India, designed to provide fast, reliable, and efficient public transportation across the city and its metropolitan area.
  • D. Indore BRTS
    Indore BRTS is a bus rapid transit system in Indore, India, designed to provide high-capacity, efficient public transportation along dedicated corridors.
  • E. Hyderabad Metro
    Hyderabad Metro is a rapid transit system serving the city of Hyderabad, India, featuring multiple elevated corridors designed to ease urban traffic congestion and improve public transportation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Hubli-Dharwad Bus Rapid Transit System
Target entity description: The Hubli-Dharwad Bus Rapid Transit System is a dedicated high-capacity bus corridor project in Karnataka, India, designed to provide faster and more efficient public transport between the twin cities of Hubli and Dharwad.
  • A. Bangalore Metro
    Bangalore Metro is a rapid transit system serving the city of Bengaluru, India, providing an elevated and underground rail network to ease urban transportation and reduce traffic congestion.
  • B. Hyderabad Multi-Modal Transport System
    The Hyderabad Multi-Modal Transport System is a suburban rail network in Hyderabad, India, designed to provide efficient, high-frequency commuter connectivity across the metropolitan region.
  • C. Surat Bus Rapid Transit System
    Surat Bus Rapid Transit System is a dedicated high-capacity bus network in Surat, India, designed to provide fast, reliable, and efficient public transportation across the city and its metropolitan area.
  • D. Indore BRTS
    Indore BRTS is a bus rapid transit system in Indore, India, designed to provide high-capacity, efficient public transportation along dedicated corridors.
  • E. Hyderabad Metro
    Hyderabad Metro is a rapid transit system serving the city of Hyderabad, India, featuring multiple elevated corridors designed to ease urban traffic congestion and improve public transportation.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46eab808190b848242d63a17c47 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69f01a78bd908190b74e26ab1cc8788f completed April 28, 2026, 2:24 a.m.
Created at: April 16, 2026, 6:50 p.m.