Triple
T21731617
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Riptide Racer |
E536419
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multi-lane racing water slide |
C8343
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multi-lane racing water slide Context triple: [Riptide Racer, instanceOf, multi-lane racing water slide]
-
A.
water ride
chosen
A water ride is an amusement attraction that uses water-filled channels, flumes, or pools to move riders through themed environments, often featuring splashes, drops, and soaking elements for entertainment.
-
B.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
C.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
-
D.
indoor water park
An indoor water park is a climate-controlled recreational facility featuring water-based attractions such as pools, slides, and play areas designed for year-round use regardless of outdoor weather conditions.
-
E.
carousel-style ride
A carousel-style ride is an amusement attraction featuring a rotating circular platform with seats, often shaped like animals or vehicles, that move up and down as the ride spins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c46d3284819099a4f9d5a704eb95 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:48 p.m.