Triple

T21688742
Position Surface form Disambiguated ID Type / Status
Subject Tsar Bomba E535300 entity
Predicate neverDeployedOperationally P144933 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Tsar Bomba, neverDeployedOperationally, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: neverDeployedOperationally
Context triple: [Tsar Bomba, neverDeployedOperationally, true]
  • A. notCommerciallyReleasedOn
    Indicates that the subject has not been made available to the public through commercial distribution or sale on the specified platform, medium, or market.
  • B. notDesignedAs
    Indicates that one entity was not created, intended, or purposed to serve as or function as the other entity.
  • C. neverCommissioned
    Indicates that an entity was created or intended for service but was never formally placed into active duty or official use.
  • D. neverLaunched
    Indicates that an entity (such as a product, project, or mission) was planned or created but was never officially initiated, released, or put into operation.
  • E. doesNotOperate
    Indicates that an entity is not functioning, active, or performing its intended operation in relation to another entity or context.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c469b6ec8190aee4cadd1527db91 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef96cd51d481908df67e4f69826b06 completed April 27, 2026, 5:03 p.m.
PD Predicate disambiguation batch_69e6969113cc8190ab69855ef5667e4b completed April 20, 2026, 9:11 p.m.
PDg Predicate description generation batch_69e69b4aa2b48190830107391e81571a completed April 20, 2026, 9:31 p.m.
Created at: April 16, 2026, 6:44 p.m.