Triple
T21684372
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Devonian Trail |
E535192
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multi‑use pathway |
C31426
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multi‑use pathway Context triple: [Devonian Trail, instanceOf, multi‑use pathway]
-
A.
multi-purpose facility
A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
-
B.
multipurpose bridge
A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
-
C.
shared path
chosen
A shared path is a common route or process used collaboratively by multiple entities to reach aligned goals or destinations.
-
D.
development pathway
A development pathway is a structured sequence of stages, actions, and decisions that guide the progression from an initial state or idea toward a defined goal or mature outcome.
-
E.
Rainbow Road variant
A Rainbow Road variant is a colorful, high-altitude racetrack characterized by its vibrant, multicolored paths, minimal guardrails, and challenging layout that often appears in racing games as a visually striking and difficult final course.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c469b6ec8190aee4cadd1527db91 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:43 p.m.