Triple

T21683181
Position Surface form Disambiguated ID Type / Status
Subject Argentine national nuclear program E535162 entity
Predicate operatesPlant P4904 FINISHED
Object Atucha I nuclear power plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atucha I nuclear power plant | Statement: [Argentine national nuclear program, operatesPlant, Atucha I nuclear power plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Atucha I nuclear power plant
Context triple: [Argentine national nuclear program, operatesPlant, Atucha I nuclear power plant]
  • A. Ascó Nuclear Power Plant
    Ascó Nuclear Power Plant is a major Spanish nuclear power facility located in Catalonia that generates electricity using pressurized water reactors.
  • B. Tihange nuclear power station
    Tihange nuclear power station is a major Belgian nuclear power plant on the Meuse River, known for its aging reactors and associated safety and political controversies.
  • C. Comahue hydroelectric complex
    The Comahue hydroelectric complex is a major system of dams and power plants in Argentina’s Comahue region that harnesses the flow of rivers such as the Limay to generate electricity.
  • D. Utanen power plant
    Utanen power plant is a hydroelectric power station located on the Oulujoki River in Finland, contributing to the region’s renewable energy production.
  • E. El Dabaa Nuclear Power Plant
    El Dabaa Nuclear Power Plant is Egypt’s first large-scale nuclear power station, being built on the Mediterranean coast with Russian assistance to generate electricity and diversify the country’s energy mix.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Atucha I nuclear power plant
Target entity description: Atucha I nuclear power plant is Argentina’s first commercial nuclear power station, a pressurized heavy-water reactor that has played a key role in the country’s nuclear energy development since the 1970s.
  • A. Ascó Nuclear Power Plant
    Ascó Nuclear Power Plant is a major Spanish nuclear power facility located in Catalonia that generates electricity using pressurized water reactors.
  • B. Tihange nuclear power station
    Tihange nuclear power station is a major Belgian nuclear power plant on the Meuse River, known for its aging reactors and associated safety and political controversies.
  • C. Comahue hydroelectric complex
    The Comahue hydroelectric complex is a major system of dams and power plants in Argentina’s Comahue region that harnesses the flow of rivers such as the Limay to generate electricity.
  • D. Utanen power plant
    Utanen power plant is a hydroelectric power station located on the Oulujoki River in Finland, contributing to the region’s renewable energy production.
  • E. El Dabaa Nuclear Power Plant
    El Dabaa Nuclear Power Plant is Egypt’s first large-scale nuclear power station, being built on the Mediterranean coast with Russian assistance to generate electricity and diversify the country’s energy mix.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c469b6ec8190aee4cadd1527db91 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef96c7c6a08190bbd9a89b8a3b921b completed April 27, 2026, 5:03 p.m.
Created at: April 16, 2026, 6:43 p.m.