Triple
T21660735
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New Motława |
E534586
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | artificial river channel |
C26460
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: artificial river channel Context triple: [New Motława, instanceOf, artificial river channel]
-
A.
engineered waterway
chosen
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
B.
artificial embankment
An artificial embankment is a man-made raised structure of earth, rock, or other materials built to contain, redirect, or protect land and infrastructure from water or other environmental forces.
-
C.
man-made basin
A man-made basin is an artificially constructed depression or container designed to hold or manage water or other liquids for purposes such as storage, irrigation, drainage, or industrial use.
-
D.
drainage channel
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
-
E.
constricted water channel
A constricted water channel is a narrow, often engineered or naturally formed passage that restricts and directs the flow of water, increasing velocity and influencing local hydrodynamics.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c467e1f48190af2650b19175abc4 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:36 p.m.