Triple

T21660714
Position Surface form Disambiguated ID Type / Status
Subject Itapura E534585 entity
Predicate hasHydroelectricInfrastructureNearby P144900 FINISHED
Object Jupiá Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jupiá Dam | Statement: [Itapura, hasHydroelectricInfrastructureNearby, Jupiá Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jupiá Dam
Context triple: [Itapura, hasHydroelectricInfrastructureNearby, Jupiá Dam]
  • A. Jupiá Dam chosen
    Jupiá Dam is a major hydroelectric dam on the Paraná River in Brazil, contributing significantly to the region’s power generation within the broader Paraná River hydroelectric complex.
  • B. Rosana Dam
    Rosana Dam is a hydroelectric dam on the Paranapanema River in Brazil, used for generating electricity as part of the broader Paraná River basin power system.
  • C. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • D. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • E. Angostura Dam
    Angostura Dam is a major hydroelectric dam in Mexico that forms part of the country’s important Grijalva River power generation system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasHydroelectricInfrastructureNearby
Context triple: [Itapura, hasHydroelectricInfrastructureNearby, Jupiá Dam]
  • A. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • B. hasHydropowerRoleIn
    Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
  • C. isHydroelectricallyDeveloped
    Indicates that an entity has been developed to generate electricity using hydropower infrastructure or facilities.
  • D. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • E. hasNearbyWaterInfrastructure
    Indicates that a location or entity is situated close to water-related infrastructure such as pipes, treatment facilities, or distribution systems.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c467e1f48190af2650b19175abc4 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef6c07bcb88190a9864672c20325ff completed April 27, 2026, 2 p.m.
PD Predicate disambiguation batch_69e696826c3c81909270791e79760937 completed April 20, 2026, 9:11 p.m.
PDg Predicate description generation batch_69e69b4aa2b48190830107391e81571a completed April 20, 2026, 9:31 p.m.
Created at: April 16, 2026, 6:36 p.m.