Triple

T21658015
Position Surface form Disambiguated ID Type / Status
Subject LUMA Energy E534516 entity
Predicate usesInfrastructurePreviouslyOwnedBy P144888 FINISHED
Object Puerto Rico Electric Power Authority NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Puerto Rico Electric Power Authority | Statement: [LUMA Energy, usesInfrastructurePreviouslyOwnedBy, Puerto Rico Electric Power Authority]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Puerto Rico Electric Power Authority
Context triple: [LUMA Energy, usesInfrastructurePreviouslyOwnedBy, Puerto Rico Electric Power Authority]
  • A. Puerto Rico Electric Power Authority chosen
    The Puerto Rico Electric Power Authority is the public corporation responsible for generating, transmitting, and distributing electricity across Puerto Rico.
  • B. Puerto Rico Electric Power Authority Revitalization Corporation
    Puerto Rico Electric Power Authority Revitalization Corporation is a special-purpose entity created to support the financial restructuring and modernization efforts of Puerto Rico’s public electric utility system.
  • C. Puerto Rico Energy Bureau
    The Puerto Rico Energy Bureau is the independent government regulatory body responsible for overseeing and regulating Puerto Rico’s energy sector, including electricity rates, planning, and utility performance.
  • D. Guam Power Authority
    Guam Power Authority is the government-owned electric utility responsible for generating, transmitting, and distributing electricity throughout Guam.
  • E. National Power Corporation
    The National Power Corporation is a Philippine government-owned corporation responsible for power generation and electrification, particularly in missionary and off-grid areas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usesInfrastructurePreviouslyOwnedBy
Context triple: [LUMA Energy, usesInfrastructurePreviouslyOwnedBy, Puerto Rico Electric Power Authority]
  • A. usesInfrastructure
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • B. previouslyLicensedAs
    Indicates that an entity held a license under a different name or status at some earlier time.
  • C. hasInfrastructureOwner
    Indicates that one entity owns or is responsible for the infrastructure associated with another entity.
  • D. ownerOfInfrastructureUsed
    Indicates that one entity owns the infrastructure that is being used by another entity or activity.
  • E. previouslyPossessedBy
    Indicates that an entity was owned or possessed by another entity at some time in the past, but is not necessarily possessed by that entity now.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c467e1f48190af2650b19175abc4 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef6c05a8d881909f747635bdb4ef09 completed April 27, 2026, 2 p.m.
PD Predicate disambiguation batch_69e696826c3c81909270791e79760937 completed April 20, 2026, 9:11 p.m.
PDg Predicate description generation batch_69e69b4aa2b48190830107391e81571a completed April 20, 2026, 9:31 p.m.
Created at: April 16, 2026, 6:36 p.m.