Triple

T21657831
Position Surface form Disambiguated ID Type / Status
Subject Mississippi Highway 16 E534511 entity
Predicate hasJunctionWith P1018 FINISHED
Object Mississippi Highway 45 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mississippi Highway 45 | Statement: [Mississippi Highway 16, hasJunctionWith, Mississippi Highway 45]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mississippi Highway 45
Context triple: [Mississippi Highway 16, hasJunctionWith, Mississippi Highway 45]
  • A. Mississippi Highway 43
    Mississippi Highway 43 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities with larger regional routes and population centers.
  • B. Mississippi Highway 4
    Mississippi Highway 4 is an east–west state highway in northern Mississippi that connects several small towns and rural communities, including Holly Springs.
  • C. Mississippi Highway 35
    Mississippi Highway 35 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities and regional centers.
  • D. Mississippi Highway 7
    Mississippi Highway 7 is a state highway in northern Mississippi that runs generally north–south, connecting several small towns and rural communities to larger regional routes.
  • E. Mississippi Highway 14
    Mississippi Highway 14 is a state highway in Mississippi that runs east–west across multiple counties, connecting rural communities and small towns in the central part of the state.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mississippi Highway 45
Target entity description: Mississippi Highway 45 is a major north–south state highway in Mississippi that connects numerous towns and cities while serving as an important regional transportation corridor.
  • A. Mississippi Highway 43
    Mississippi Highway 43 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities with larger regional routes and population centers.
  • B. Mississippi Highway 4
    Mississippi Highway 4 is an east–west state highway in northern Mississippi that connects several small towns and rural communities, including Holly Springs.
  • C. Mississippi Highway 35
    Mississippi Highway 35 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities and regional centers.
  • D. Mississippi Highway 7
    Mississippi Highway 7 is a state highway in northern Mississippi that runs generally north–south, connecting several small towns and rural communities to larger regional routes.
  • E. Mississippi Highway 14
    Mississippi Highway 14 is a state highway in Mississippi that runs east–west across multiple counties, connecting rural communities and small towns in the central part of the state.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c467e1f48190af2650b19175abc4 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef6c05a8d881909f747635bdb4ef09 completed April 27, 2026, 2 p.m.
Created at: April 16, 2026, 6:36 p.m.