Triple
T21648738
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | County Road 455 |
E534281
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | County Road 561A |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: County Road 561A | Statement: [County Road 455, connectsTo, County Road 561A]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: County Road 561A Context triple: [County Road 455, connectsTo, County Road 561A]
-
A.
County Road 561
chosen
County Road 561 is a regional roadway that serves as a connector route within its local county transportation network.
-
B.
County Road 513
County Road 513 is a local roadway in Michigan’s Upper Peninsula that serves as a primary access route to and through the Bessemer area.
-
C.
County Road 550
County Road 550 is a scenic north–south route in Michigan’s Upper Peninsula that runs from Marquette to the small community of Big Bay along the Lake Superior shoreline.
-
D.
County Road 361
County Road 361 is a local roadway in Taylor County, Florida, that serves as the primary route connecting inland areas to the coastal community of Keaton Beach.
-
E.
County Road 52
County Road 52 is a local roadway in Alabama that includes the historic Horton Mill Covered Bridge along its route.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c466aec88190ba39c7543dbc8ba2 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69ef59131c88819082df8e5b87f5954b |
completed | April 27, 2026, 12:39 p.m. |
Created at: April 16, 2026, 6:35 p.m.