Triple

T21646883
Position Surface form Disambiguated ID Type / Status
Subject Simplon railway line E534243 entity
Predicate instanceOf P0 FINISHED
Object trans-Alpine rail route C22714 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: trans-Alpine rail route
Context triple: [Simplon railway line, instanceOf, trans-Alpine rail route]
  • A. transalpine railway chosen
    A transalpine railway is a rail line that crosses or traverses the Alps, typically using tunnels, viaducts, and mountain passes to connect regions on either side of the mountain range.
  • B. transalpine trade route
    A transalpine trade route is a transportation corridor that crosses the Alps to facilitate the movement of goods, people, and cultural exchange between regions on either side of the mountain range.
  • C. Autobahn in Austria
    The "Autobahn in Austria" class represents high-speed, limited-access motorway segments within Austria’s national road network, including their physical attributes, legal regulations, and operational characteristics.
  • D. Grande Randonnée route
    A Grande Randonnée route is a long-distance, waymarked hiking trail, primarily found in Europe, designed for multi-day treks through varied natural and cultural landscapes.
  • E. trans-Andean railway
    A trans-Andean railway is a rail line that crosses the Andes Mountains, connecting regions or countries on either side of the range to facilitate transportation and trade.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c466aec88190ba39c7543dbc8ba2 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:35 p.m.