Triple

T21646668
Position Surface form Disambiguated ID Type / Status
Subject Arbengrat E534236 entity
Predicate partOf P40 FINISHED
Object Ober Gabelhorn normal and classic routes network NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ober Gabelhorn normal and classic routes network | Statement: [Arbengrat, partOf, Ober Gabelhorn normal and classic routes network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ober Gabelhorn normal and classic routes network
Context triple: [Arbengrat, partOf, Ober Gabelhorn normal and classic routes network]
  • A. Großglockner climbing route network
    The Großglockner climbing route network is the interconnected system of alpine ascent routes, huts, and access paths leading to and around Austria’s highest peak, the Großglockner.
  • B. Großglockner normal approach route
    The Großglockner normal approach route is the standard alpine ascent line used by most climbers to reach the summit of Austria’s highest mountain.
  • C. Watzmann traverse
    The Watzmann traverse is a renowned alpine ridge route in the Bavarian Alps that crosses multiple summits of the Watzmann massif and is known for its exposed, challenging climbing and spectacular views.
  • D. Climbing the Matterhorn
    Climbing the Matterhorn is a short live-action film recognized for its depiction of mountaineering on the iconic Alpine peak, the Matterhorn.
  • E. Hornbein Couloir route
    The Hornbein Couloir route is a steep, high-altitude climbing line on the north side of Mount Everest, renowned for its technical difficulty and historical significance in Himalayan mountaineering.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ober Gabelhorn normal and classic routes network
Target entity description: Ober Gabelhorn normal and classic routes network is a collection of established alpine climbing and mountaineering routes on the Ober Gabelhorn in the Swiss Alps, encompassing its standard and historically significant ascents.
  • A. Großglockner climbing route network
    The Großglockner climbing route network is the interconnected system of alpine ascent routes, huts, and access paths leading to and around Austria’s highest peak, the Großglockner.
  • B. Großglockner normal approach route
    The Großglockner normal approach route is the standard alpine ascent line used by most climbers to reach the summit of Austria’s highest mountain.
  • C. Watzmann traverse
    The Watzmann traverse is a renowned alpine ridge route in the Bavarian Alps that crosses multiple summits of the Watzmann massif and is known for its exposed, challenging climbing and spectacular views.
  • D. Climbing the Matterhorn
    Climbing the Matterhorn is a short live-action film recognized for its depiction of mountaineering on the iconic Alpine peak, the Matterhorn.
  • E. Hornbein Couloir route
    The Hornbein Couloir route is a steep, high-altitude climbing line on the north side of Mount Everest, renowned for its technical difficulty and historical significance in Himalayan mountaineering.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c466aec88190ba39c7543dbc8ba2 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef591194dc8190a57b28eaddeceff5 completed April 27, 2026, 12:39 p.m.
Created at: April 16, 2026, 6:35 p.m.