Triple

T21625105
Position Surface form Disambiguated ID Type / Status
Subject Pakistan national power grid E533680 entity
Predicate abbreviation P43 FINISHED
Object NTDC grid NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NTDC grid | Statement: [Pakistan national power grid, abbreviation, NTDC grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NTDC grid
Context triple: [Pakistan national power grid, abbreviation, NTDC grid]
  • A. North Eastern Regional Grid
    The North Eastern Regional Grid is a major power transmission network that supplies and coordinates electricity across India’s northeastern states as part of the national grid system.
  • B. Indian national grid
    The Indian national grid is the countrywide interconnected power transmission network that enables electricity generated across India to be distributed reliably and efficiently to consumers in all regions.
  • C. Northern Regional Grid of India
    The Northern Regional Grid of India is a major interconnected power network that coordinates electricity generation and transmission across multiple northern Indian states to ensure reliable supply and grid stability.
  • D. Eastern Regional Grid of India
    The Eastern Regional Grid of India is a major interconnected power network that coordinates electricity generation, transmission, and distribution across the eastern states of the country.
  • E. OS National Grid
    OS National Grid is the national coordinate reference system used in Great Britain for accurately mapping and locating geographic features.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: NTDC grid
Target entity description: The NTDC grid is Pakistan’s nationwide high-voltage electricity transmission network operated by the National Transmission and Despatch Company.
  • A. North Eastern Regional Grid
    The North Eastern Regional Grid is a major power transmission network that supplies and coordinates electricity across India’s northeastern states as part of the national grid system.
  • B. Indian national grid
    The Indian national grid is the countrywide interconnected power transmission network that enables electricity generated across India to be distributed reliably and efficiently to consumers in all regions.
  • C. Northern Regional Grid of India
    The Northern Regional Grid of India is a major interconnected power network that coordinates electricity generation and transmission across multiple northern Indian states to ensure reliable supply and grid stability.
  • D. Eastern Regional Grid of India
    The Eastern Regional Grid of India is a major interconnected power network that coordinates electricity generation, transmission, and distribution across the eastern states of the country.
  • E. OS National Grid
    OS National Grid is the national coordinate reference system used in Great Britain for accurately mapping and locating geographic features.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c464fba881908d0ff2ac80511ce1 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef52121c3c8190b9b4d862ed247c71 completed April 27, 2026, 12:09 p.m.
Created at: April 16, 2026, 6:34 p.m.