Triple

T21619847
Position Surface form Disambiguated ID Type / Status
Subject Turlock Main Canal E533546 entity
Predicate instanceOf P0 FINISHED
Object water conveyance infrastructure C16044 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c464fba881908d0ff2ac80511ce1 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:34 p.m.