Triple

T21619789
Position Surface form Disambiguated ID Type / Status
Subject Rufus Sixsmith (1970s) E533544 entity
Predicate worksOn P3 FINISHED
Object Seaboard HYDRA nuclear power plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Seaboard HYDRA nuclear power plant | Statement: [Rufus Sixsmith (1970s), worksOn, Seaboard HYDRA nuclear power plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Seaboard HYDRA nuclear power plant
Context triple: [Rufus Sixsmith (1970s), worksOn, Seaboard HYDRA nuclear power plant]
  • A. Gone Fission Hydroplant
    Gone Fission Hydroplant is a cooperative Salmon Run stage in the Splatoon series set in a large, industrial hydroelectric power facility surrounded by water hazards.
  • B. Tihange nuclear power station
    Tihange nuclear power station is a major Belgian nuclear power plant on the Meuse River, known for its aging reactors and associated safety and political controversies.
  • C. Artificial Island nuclear complex
    The Artificial Island nuclear complex is a major nuclear power facility in New Jersey that hosts multiple generating stations, including the Hope Creek and Salem nuclear plants, on an artificial island along the Delaware River.
  • D. Hatch Nuclear Power Plant
    Hatch Nuclear Power Plant is a commercial nuclear power generating facility in Georgia that supplies electricity to the regional grid as part of Southern Company's energy portfolio.
  • E. Lingen nuclear power plant
    The Lingen nuclear power plant is a former German nuclear power station located near the town of Lingen in Lower Saxony, which operated from the late 1960s until its shutdown in the 1970s.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Seaboard HYDRA nuclear power plant
Target entity description: The Seaboard HYDRA nuclear power plant is a fictional U.S. energy facility featured in David Mitchell’s novel "Cloud Atlas," central to a storyline involving corporate corruption and a dangerous reactor safety cover-up.
  • A. Gone Fission Hydroplant
    Gone Fission Hydroplant is a cooperative Salmon Run stage in the Splatoon series set in a large, industrial hydroelectric power facility surrounded by water hazards.
  • B. Tihange nuclear power station
    Tihange nuclear power station is a major Belgian nuclear power plant on the Meuse River, known for its aging reactors and associated safety and political controversies.
  • C. Artificial Island nuclear complex
    The Artificial Island nuclear complex is a major nuclear power facility in New Jersey that hosts multiple generating stations, including the Hope Creek and Salem nuclear plants, on an artificial island along the Delaware River.
  • D. Hatch Nuclear Power Plant
    Hatch Nuclear Power Plant is a commercial nuclear power generating facility in Georgia that supplies electricity to the regional grid as part of Southern Company's energy portfolio.
  • E. Lingen nuclear power plant
    The Lingen nuclear power plant is a former German nuclear power station located near the town of Lingen in Lower Saxony, which operated from the late 1960s until its shutdown in the 1970s.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c464fba881908d0ff2ac80511ce1 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef3bad094c8190879d4aef7988254a completed April 27, 2026, 10:34 a.m.
Created at: April 16, 2026, 6:34 p.m.