Triple

T21612216
Position Surface form Disambiguated ID Type / Status
Subject Arganzuela E533339 entity
Predicate hasLandmark P105 FINISHED
Object Puente de Toledo NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Puente de Toledo | Statement: [Arganzuela, hasLandmark, Puente de Toledo]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Puente de Toledo
Context triple: [Arganzuela, hasLandmark, Puente de Toledo]
  • A. Puente de Toledo chosen
    Puente de Toledo is a historic Baroque stone bridge in Madrid, Spain, renowned for its ornate sculptures and architectural significance.
  • B. Puente de Segovia
    Puente de Segovia is a historic stone bridge in Madrid, Spain, renowned as one of the city’s oldest surviving river crossings.
  • C. Puente de Bujaruelo
    Puente de Bujaruelo is a historic stone bridge in the Spanish Pyrenees, serving as a scenic crossing point and gateway for hikers in the Bujaruelo Valley.
  • D. Pont d’Espagne
    Pont d’Espagne is a scenic mountain pass and former trading route in the French Pyrenees, known for its dramatic waterfalls, stone bridge, and access to popular hiking areas in the Pyrenees National Park.
  • E. Granada Bridge
    Granada Bridge is a vehicular bridge in Ormond Beach, Florida, that spans the Halifax River as part of State Road 40.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46411108190bba0d4176dffc9f3 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef3ba79424819094e9ee93c4bbcc0b completed April 27, 2026, 10:34 a.m.
Created at: April 16, 2026, 6:33 p.m.