Triple

T2159972
Position Surface form Disambiguated ID Type / Status
Subject Metro Line 3 E47977 entity
Predicate instanceOf P0 FINISHED
Object Mexico City Metro line C640 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Mexico City Metro line
Context triple: [Metro Line 3, instanceOf, Mexico City Metro line]
  • A. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • B. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • C. Maya city
    A Maya city is a pre-Columbian urban center of the Maya civilization characterized by monumental architecture, complex social and political organization, and integration with surrounding agricultural and ritual landscapes.
  • D. rapid transit line chosen
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • E. AeroTrain station
    An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a1d1fd8819088b34990d69a712f completed March 4, 2026, 7:38 p.m.
Created at: March 4, 2026, 7:45 p.m.